DAN’S POLE BARN
100 × 60 ft · 6,000 sq ft · 16 ft eaves
Opening Grand River Estates
A BaseMod Homes concept experience for Grand River Estates and Dan’s pole barn.
Visualization only; concept boundaries and siting.
19 labeled lots from the supplied plan layouts and Regrid parcel export. Seventeen retained adjustable concept homes use Hawthorne and Haven appearance references. Western lot boundaries are approximate plan traces. East Lots 15–17 use current parcel outlines; “18” is the historical label for the current river remainder.
A1 and D2 have no assigned home in the current saved concept layout. B1 retains its saved Haven concept. This does not determine buildability. Home style, elevation and siting are for exploration.
Mapbox displays the supplied community concept outlines in the overview. The immersive Cesium view displays the source parcel outlines from your August 5, 2026 Regrid export, over USGS / USDA aerial imagery. The emphasized outline is PIN 70-04-34-400-003.
Recorded parcels total 77.19 provider acres. They are not the survey’s proposed 52.8± acre “New Overall 1.” The ground uses locally retained USGS 3DEP elevations, with an approximate NOAA GEOID18 height correction. Terrain coverage is bounded to this site. Aerial imagery is historical source context. The immersive landscaping layer retains the original artist-created trees, shrubs and lawns. Its visibility setting carries through from the overview; Mapbox does not invent a tree layer. It does not represent a surveyed tree inventory, approved clearing or driveway design.
Property view opens on demand.
100 × 60 ft, 16 ft eaves, 4:12 roof, ridge east–west. Two 14 × 14 ft overhead openings and a service door follow the Bex gable sheet. The east-facing gable is provisional.
The brief’s four south-wall doors conflict with Bex. Finishes, lighting, framing web details and landscaping are illustrative. The source-view barn is separate from the globe until Nederveld supplies a coordinate tie to the staked pad.
Use your existing ion token. It stays in this page’s memory and is sent only to Cesium to request terrain. No token is saved or included in the model.
Visualization only. Not a permit sheet or survey. Concept boundaries and siting.
Phase 4 frames the marina planning area; dock layout is not yet drawn.